Cookies on our website

We use cookies to give you the best experience on our website. If you continue without changing your settings, we'll assume that you are happy to receive all cookies on this site. However, if you wish, you can delete our cookies at any time.

  • Skip navigation
Thames Tideway Tunnel: Creating a cleaner, healthier River Thames Thames Tideway Tunnel: Creating a cleaner, healthier River Thames
Thames Water Thames Water
  • Home
  • What we’re doing
  • News
  • Document library
  • Construction sites
  • Procurement

Document library

  • Timeline of documents
  • Documents by category
    • Archive: Pre-consultation documents
    • Archive: Phase 1 consultation documents
    • Archive: Interim engagement documents
    • Archive: EIA scoping report and appendices

Timeline of documents

Post this page to FacebookPost this page to TwitterShare this pageEmail this pagePrint this page
  • 1. Pre consultation documents (2004 - 2010)

    These documents are archived on the left

  • 4. Phase one consultation (Sep 2010 - Jan 2011)

    These documents are archived on the left

  • 5. Interim engagement (Mar 2011 - July 2011)

    These documents are archived on the left

  • 6. Scheme Development: Environmental Information (2011)

    These documents are archived on the left

  • 7. Phase two consultation (Nov 2011 - Feb 2012)
    View document Summary Download
    Abbey Mills Pumping Station - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (28 pages)
    Abbey Mills Pumping Station display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Abbey Mills Pumping Station.PDF
    (1 pages)
    Acton Storm Tanks - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (32 pages)
    Acton Storm Tanks display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Acton Storm Tanks.PDF
    (1 pages)
    Air management planAir management plan defines how air from the proposed Thames Tunnel project is vented into and out of the tunnel system and how air releases are controlled and treated. It outlines operational and management procedures for controlling air movement, and treatment of air to meet regulatory requirements and limit the extent of nuisance odours.PDF
    (49 pages)
    Albert Embankment Foreshore - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (32 pages)
    Albert Embankment Foreshore display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Albert Embankment Foreshore.PDF
    (1 pages)
    Amendments to the Report on phase two consultation

    This document sets out the amendments to the Report on phase two consultation following its publication, as at 30 May 2012.

    PDF
    (2 pages)
    Barn Elms - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (32 pages)
    Barn Elms display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Barn Elms.PDF
    (1 pages)
    Beckton Sewage Treatment Works - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (16 pages)
    Beckton Sewage Treatment Works display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Beckton Sewage Treatment Works.PDF
    (1 pages)
    Bekesbourne Street - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (12 pages)
    Blackfriars Bridge Foreshore - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (32 pages)
    Blackfriars Bridge Foreshore display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Blackfriars Bridge Foreshore.PDF
    (1 pages)
    Book of plans - Abbey Mills Pumping StationPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - Acton Storm TanksPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - Albert Embankment ForeshorePlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (6 pages)
    Book of plans - Barn ElmsPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - Beckton Sewage Treatment WorksPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (4 pages)
    Book of plans - Blackfriars Bridge ForeshorePlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (7 pages)
    Book of plans - Carnwath Road RiversidePlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - Chambers WharfPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - Chelsea Embankment ForeshorePlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (6 pages)
    Book of plans - Cremorne Wharf DepotPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - Deptford Church StreetPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - Dormay StreetPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - Earl Pumping StationPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - Falconbrook Pumping StationPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - Greenwich Pumping StationPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (7 pages)
    Book of plans - Hammersmith Pumping StationPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - Heathwall Pumping StationPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - King Edward Memorial Park ForeshorePlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - King George's ParkPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - Kirtling StreetPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - Putney Bridge ForeshorePlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - Shad Thames Pumping StationPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - Victoria Embankment ForeshorePlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (6 pages)
    Build - How we will build the tunnelProject information paper explaining how the Thames Tunnel will be built.PDF
    (7 pages)
    Carnwath Road Riverside - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (36 pages)
    Carnwath Road Riverside display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Carnwath Road Riverside.PDF
    (1 pages)
    Chambers Wharf - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (36 pages)
    Chambers Wharf air monitoring updateAn update on results from air monitoring at the proposed Chambers Wharf site.PDF
    (1 pages)
    Chambers Wharf display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Chambers Wharf.PDF
    (1 pages)
    Changes - The changes since phase one consultationProject information paper explaining the changes that have been made to our proposals since phase one consultation.PDF
    (7 pages)
    Chelsea Embankment Foreshore - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (32 pages)
    Chelsea Embankment Foreshore display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Chelsea Embankment Foreshore.PDF
    (1 pages)
    Code of Construction Practice - Part A: General requirementsThe Code of construction practice Part A: General requirements sets out a series of objectives and measures to be applied throughout the construction period.PDF
    (88 pages)
    Combined sewer overflow sites display boardA display board showing an illustrative representation of what a combined sewer overflow (CSO) site might look like.PDF
    ( pages)
    Community consultation strategySets out our approach and timetable for consulting key stakeholders and those with an interest in the project.PDF
    (37 pages)
    Consultation - Our approach to consultationProject information paper explaining our approach to consultation on the Thames Tunnel.PDF
    (4 pages)
    Costs and Benefits of the Thames TunnelThis annex sets out more detail on the high-level calculations which have been performed by Defra to update the monetary costs and benefits of the Thames Tunnel first estimated in 2007. It is accompanied by a table breaking down the results of the analysis by cost and benefit category (see Table 1 at the end of the Annex).PDF
    (8 pages)
    Creating a River Thames fit for our futureThis document summarises the strategic and economic case for the Thames Tunnel and explains why Defra believes that a tunnel remains the preferred solution for dealing adequately with the untreated sewage that is polluting the River Thames. This provides an update to the 2007 regulatory impact assessment and takes into account data emerging since that time.PDF
    (18 pages)
    Cremorne Wharf Depot - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (32 pages)
    Cremorne Wharf Depot display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Cremorne Wharf Depot.PDF
    (1 pages)
    Customer Overview LeafletOverview leaflet highlighting the need for the Thames Tunnel and the proposed solution. Leaflet includes a map of London showing the potential worksites and the route of the preferred tunnel alignment.PDF
    (4 pages)
    Deptford Church Street - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (32 pages)
    Design - Our approach to designProject information paper explaining our approach to design for the above ground structures of the Thames Tunnel.PDF
    (4 pages)
    Design development report - Appendix A - Acton Storm TanksThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    ( pages)
    Design development report - Appendix B - Hammersmith Pumping StationThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    ( pages)
    Design development report - Appendix C - Barn ElmsThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    ( pages)
    Design development report - Appendix D - Putney BridgeThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    ( pages)
    Design development report - Appendix E - Dormay StreetThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    ( pages)
    Design development report - Appendix F - King George's ParkThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    ( pages)
    Design development report - Appendix G - Carnwath Road RiversideThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    ( pages)
    Design development report - Appendix H - Falconbrook Pumping StationThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    ( pages)
    Design development report - Appendix J - Cremorne Wharf DepotThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    ( pages)
    Design development report - Appendix K - Chelsea Embankment ForeshoreThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    ( pages)
    Design development report - Appendix L - Kirtling StreetThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    ( pages)
    Design development report - Appendix M - Heathwall Pumping StationThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    ( pages)
    Design development report - Appendix N - Albert Embankment ForeshoreThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    ( pages)
    Design development report - Appendix P - Victoria Embankment ForeshoreThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    ( pages)
    Design development report - Appendix Q - Blackfriars Bridge ForeshoreThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    ( pages)
    Design development report - Appendix R - Chambers WharfThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    ( pages)
    Design development report - Appendix S - King Edward Memorial Park ForeshoreThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    ( pages)
    Design development report - Appendix T - Earl Pumping StationThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    ( pages)
    Design development report - Appendix U - Deptford Church StreetThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    ( pages)
    Design development report - Appendix V - Greenwich Pumping StationThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    ( pages)
    Design development report - Appendix W - Abbey Mills Pumping StationThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    ( pages)
    Design development report - Appendix X - Beckton Sewage Treatment WorksThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    ( pages)
    Design development report - Appendix Y - Other worksThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    ( pages)
    Design development report - main reportThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    (46 pages)
    Dormay Street - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (32 pages)
    Dormay Street display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Dormay Street.PDF
    (1 pages)
    Draft waste strategyProvides information on how building materials and resulting waste, including excavated waste will be managed during construction of the Thames Tunnel.PDF
    (97 pages)
    Earl Pumping Station - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (28 pages)
    Earl Pumping Station display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Earl Pumping Station.PDF
    (1 pages)
    EnvironmentThis paper explains the Environmental Impact Assessment (EIA) we are undertaking, to understand the environmental benefits and impacts the construction and operation of the Thames Tunnel project may have. It will also inform the project’s design.PDF
    (6 pages)
    Exhibition timetableTimetable of drop-in exhibitions for phase two consultation.PDF
    (1 pages)
    Falconbrook Pumping Station - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (32 pages)
    Falconbrook Pumping Station display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Falconbrook Pumping Station.PDF
    (1 pages)
    Funding - How the project will be paid forProject information paper explaining how the construction and operation of the Thames Tunnel will be funded.PDF
    (2 pages)
    Funding display boardA display board outlining how the Thames Tunnel would be paid for and what the cost impact will be for Thames Water customers.PDF
    ( pages)
    Greenwich Pumping Station - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (32 pages)
    Guide to phase two consultationInformation guide explaining where to find information in the documents produced for phase two consultation on the Thames Tunnel.PDF
    (6 pages)
    Hammersmith & Fulham Tunnel News, January 2012The first issue of Tunnel News - a regular update about events, meetings and news for sites in the Hammersmith & Fulham area.PDF
    (2 pages)
    Hammersmith Pumping Station - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (32 pages)
    Hammersmith Pumping Station display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Hammersmith Pumping Station.PDF
    (1 pages)
    Heathwall Pumping Station - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (32 pages)
    Interim engagement reportThis report provides a summary of feedback received from members of the public and other stakeholders in response to the interim engagement events undertaken between 11 March 2011 and 16 August 2011.PDF
    (138 pages)
    Interim engagement report addendumAn addendum to our Interim engagement report (summer 2011), which has been produced to reflect additional feedback that we have received since we completed our interim engagement; and to report on the findings of further interim engagement for Kirtling Street.PDF
    (13 pages)
    Jews Row - phase two site information paperInformation paper explaining how we no longer need to use the Jews Row site.PDF
    (4 pages)
    Key PlanLondon wide map showing the preferred route of the tunnel and the locations of the phase preferred worksites at phase two consultation.PDF
    (1 pages)
    King Edward Memorial Park Foreshore - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (36 pages)
    King Edward Memorial Park Foreshore display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at King Edward Memorial Park Foreshore.PDF
    (1 pages)
    King George's Park - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (28 pages)
    King George's Park display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at King George's Park.PDF
    (1 pages)
    Kirtling Street - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (32 pages)
    Kirtling Street display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Kirtling Street.PDF
    (1 pages)
    Main report on phase two consultationThe main report of phase two consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the preferred tunnel route and sites, and the next steps moving forward.PDF
    (558 pages)
    Main report on phase two consultation - Appendix ARoute and site location diagramPDF
    (2 pages)
    Main report on phase two consultation - Appendix BPhase two consultation Statement of Community ConsultationPDF
    (2 pages)
    Main report on phase two consultation - Appendix CLocal authorities, Greater London Authority and statutory consulteesPDF
    (7 pages)
    Main report on phase two consultation - Appendix DLand referencing methodologyPDF
    (4 pages)
    Main report on phase two consultation - Appendix EList of newspaper advertsPDF
    (2 pages)
    Main report on phase two consultation - Appendix FMeans of invitation and copies of invite letterPDF
    (19 pages)
    Main report on phase two consultation - Appendix GLocation of site noticesPDF
    (68 pages)
    Main report on phase two consultation - Appendix HLeafletsPDF
    (33 pages)
    Main report on phase two consultation - Appendix IMethodology and output from community auditPDF
    (30 pages)
    Main report on phase two consultation - Appendix JList of meetings attendedPDF
    (3 pages)
    Main report on phase two consultation - Appendix KList of town halls and librariesPDF
    (3 pages)
    Main report on phase two consultation - Appendix LExhibitionsPDF
    (2 pages)
    Main report on phase two consultation - Appendix MFeedback formPDF
    (13 pages)
    Main report on phase two consultation - Appendix NQuality assurancePDF
    (6 pages)
    Main tunnel sites display boardA display board showing an illustrative representative of what our main tunnel sites might look like.PDF
    ( pages)
    Managing constructionProject information paper explaining how we will manage the potential effects of construction activity.PDF
    (4 pages)
    Managing construction display boardA display board outlining how we will manage construction impacts if the Thames Tunnel is built.PDF
    ( pages)
    Map - East LondonMap of East London showing preferred tunnel route, local CSOs, pumping stations and phase two consultation worksites. Please note this document is quite large in order to show the relevant level of detail. It may take a long time to download or view on a slow connection.PDF
    (1 pages)
    Map - West LondonMap of West London showing preferred tunnel route, local CSOs, pumping stations and phase two consultation worksites. Please note this document is quite large in order to show the relevant level of detail. It may take a long time to download or view on a slow connection.PDF
    (1 pages)
    Odour - How we will control odourProject information paper explaining how we intend to control odour.PDF
    (5 pages)
    Odour display boardA display board outlining our air management plan.PDF
    ( pages)
    OptionsProject information paper explaining the other options that were considered to reduce sewage overflows from London's Victorian sewerage system into the River Thames.PDF
    (4 pages)
    Options display boardA display board outlining the options to deal with sewage overflows that we have considered.PDF
    (1 pages)
    Other Works - phase two site information paperSite information paper explaining our phase two consultation proposals other non site specific works.PDF
    (8 pages)
    OverflowInformation paper describing the problem of sewage overflows from London's Victorian sewerage systemPDF
    (2 pages)
    Overflow display boardA display board outlining why we need to deal with the problem of sewage overflows in the River Thames.PDF
    (1 pages)
    PEIR Figures Volume 01-06 Part 01Figures to accompany the Preliminary environmental information report.PDF
    (12 pages)
    PEIR Figures Volume 01-06 Part 02Figures to accompany the Preliminary environmental information report.PDF
    (14 pages)
    PEIR Figures Volume 01-06 Part 03Figures to accompany the Preliminary environmental information report.PDF
    (12 pages)
    PEIR Figures Volume 01-06 Part 04Figures to accompany the Preliminary environmental information report.PDF
    (11 pages)
    PEIR Figures Volume 01-06 Part 05Figures to accompany the Preliminary environmental information report.PDF
    (7 pages)
    PEIR Figures Volume 01-06 Part 06Figures to accompany the Preliminary environmental information report.PDF
    (6 pages)
    PEIR Figures Volume 07 - Acton Storm Tanks - Part 01Figures to accompany the Preliminary environmental information report.PDF
    (8 pages)
    PEIR Figures Volume 07 - Acton Storm Tanks - Part 02Figures to accompany the Preliminary environmental information report.PDF
    (26 pages)
    PEIR Figures Volume 08 - Hammersmith Pumping Station - Part 01Figures to accompany the Preliminary environmental information report.PDF
    (14 pages)
    PEIR Figures Volume 08 - Hammersmith Pumping Station - Part 02Figures to accompany the Preliminary environmental information report.PDF
    (18 pages)
    PEIR Figures Volume 09 - Barn Elms - Part 01Figures to accompany the Preliminary environmental information report.PDF
    (10 pages)
    PEIR Figures Volume 09 - Barn Elms - Part 02Figures to accompany the Preliminary environmental information report.PDF
    (24 pages)
    PEIR Figures Volume 10 - Putney Bridge Foreshore - Part 01Figures to accompany the Preliminary environmental information report.PDF
    (12 pages)
    PEIR Figures Volume 10 - Putney Bridge Foreshore - Part 02Figures to accompany the Preliminary environmental information report.PDF
    (25 pages)
    PEIR Figures Volume 11 - Dormay StreetFigures to accompany the Preliminary environmental information report.PDF
    (33 pages)
    PEIR Figures Volume 12 - King George's ParkFigures to accompany the Preliminary environmental information report.PDF
    (33 pages)
    PEIR Figures Volume 13 - Carnwath Road RiversideFigures to accompany the Preliminary environmental information report.PDF
    (32 pages)
    PEIR Figures Volume 14 - Falconbrook Pumping StationFigures to accompany the Preliminary environmental information report.PDF
    (30 pages)
    PEIR Figures Volume 15 - Cremorne Wharf Depot - Part 01Figures to accompany the Preliminary environmental information report.PDF
    (16 pages)
    PEIR Figures Volume 15 - Cremorne Wharf Depot - Part 02Figures to accompany the Preliminary environmental information report.PDF
    (15 pages)
    PEIR Figures Volume 16 - Chelsea Embankment Foreshore - Part 01Figures to accompany the Preliminary environmental information report.PDF
    (10 pages)
    PEIR Figures Volume 16 - Chelsea Embankment Foreshore - Part 02Figures to accompany the Preliminary environmental information report.PDF
    (27 pages)
    PEIR Figures Volume 17 - Kirtling Street - Part 01Figures to accompany the Preliminary environmental information report.PDF
    (16 pages)
    PEIR Figures Volume 17 - Kirtling Street - Part 02Figures to accompany the Preliminary environmental information report.PDF
    (17 pages)
    PEIR Figures Volume 18 - Heathwall Pumping StationFigures to accompany the Preliminary environmental information report.PDF
    (33 pages)
    PEIR Figures Volume 19 - Albert Embankment Foreshore - Part 01Figures to accompany the Preliminary environmental information report.PDF
    (10 pages)
    PEIR Figures Volume 19 - Albert Embankment Foreshore - Part 02Figures to accompany the Preliminary environmental information report.PDF
    (27 pages)
    PEIR Figures Volume 20 - Victoria Embankment Foreshore - Part 01Figures to accompany the Preliminary environmental information report.PDF
    (16 pages)
    PEIR Figures Volume 20 - Victoria Embankment Foreshore - Part 02Figures to accompany the Preliminary environmental information report.PDF
    (18 pages)
    PEIR Figures Volume 21 - Blackfriars Bridge Foreshore - Part 01Figures to accompany the Preliminary environmental information report.PDF
    (18 pages)
    PEIR Figures Volume 21 - Blackfriars Bridge Foreshore - Part 02Figures to accompany the Preliminary environmental information report.PDF
    (19 pages)
    PEIR Figures Volume 22 - Chambers WharfFigures to accompany the Preliminary environmental information report.PDF
    (34 pages)
    PEIR Figures Volume 23 - King Edward Memorial Park Foreshore - Part 01Figures to accompany the Preliminary environmental information report.PDF
    (10 pages)
    PEIR Figures Volume 23 - King Edward Memorial Park Foreshore - Part 02Figures to accompany the Preliminary environmental information report.PDF
    (22 pages)
    PEIR Figures Volume 24 - Earl Pumping StationFigures to accompany the Preliminary environmental information report.PDF
    (31 pages)
    PEIR Figures Volume 25 - Deptford Church StreetFigures to accompany the Preliminary environmental information report.PDF
    (32 pages)
    PEIR Figures Volume 26 - Greenwich Pumping StationFigures to accompany the Preliminary environmental information report.PDF
    (10 pages)
    PEIR Figures Volume 27 - Abbey Mills Pumping StationFigures to accompany the Preliminary environmental information report.PDF
    (31 pages)
    PEIR Figures Volume 28 - Beckton Sewage Treatment WorksFigures to accompany the Preliminary environmental information report.PDF
    ( pages)
    PEIR Main report - Volume 01 - IntroductionPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (48 pages)
    PEIR Main report - Volume 02 - Proposed developmentPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (161 pages)
    PEIR Main report - Volume 03 - AlternativesPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (79 pages)
    PEIR Main report - Volume 04 - Scoping opinions and technical engagementPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (148 pages)
    PEIR Main report - Volume 05 - Assessment methodologyPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (320 pages)
    PEIR Main report - Volume 05 - Assessment methodology (Appendix A)The Code of construction practice Part A: General requirements sets out a series of objectives and measures to be applied throughout the construction period.PDF
    (88 pages)
    PEIR Main report - Volume 06 - Project-wide assessmentPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (267 pages)
    PEIR Main report - Volume 07 - Acton Storm TanksPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (322 pages)
    PEIR Main report - Volume 08 - Hammersmith Pumping StationPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (311 pages)
    PEIR Main report - Volume 09 - Barn ElmsPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (354 pages)
    PEIR Main report - Volume 10 - Putney Bridge ForeshorePreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (407 pages)
    PEIR Main report - Volume 11 - Dormay StreetPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (325 pages)
    PEIR Main report - Volume 12 - King George's ParkPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (323 pages)
    PEIR Main report - Volume 13 - Carnwath Road RiversidePreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (355 pages)
    PEIR Main report - Volume 14 - Falconbrook Pumping StationPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (314 pages)
    PEIR Main report - Volume 15 - Cremorne Wharf DepotPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (346 pages)
    PEIR Main report - Volume 16 - Chelsea Embankment ForeshorePreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (378 pages)
    PEIR Main report - Volume 17 - Kirtling StreetPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (385 pages)
    PEIR Main report - Volume 18 - Heathwall Pumping StationPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (375 pages)
    PEIR Main report - Volume 19 - Albert Embankment ForeshorePreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (395 pages)
    PEIR Main report - Volume 20 - Victoria Embankment ForeshorePreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (399 pages)
    PEIR Main report - Volume 21 - Blackfriars Bridge ForeshorePreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (413 pages)
    PEIR Main report - Volume 22 - Chambers WharfPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (353 pages)
    PEIR Main report - Volume 23 - King Edward Memorial Park ForeshorePreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (402 pages)
    PEIR Main report - Volume 24 - Earl Pumping StationPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (307 pages)
    PEIR Main report - Volume 25 - Deptford Church StreetPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (326 pages)
    PEIR Main report - Volume 26 - Greenwich Pumping StationPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (347 pages)
    PEIR Main report - Volume 27 - Abbey Mills Pumping StationPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (291 pages)
    PEIR Main report - Volume 28 - Beckton Sewage Treatment WorksPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (230 pages)
    PEIR Non-technical summary - Section 01-05Non-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (37 pages)
    PEIR Non-technical summary - Section 01-05 (Figure 28.1)Non-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (3 pages)
    PEIR Non-technical summary - Section 06 - Acton Storm TanksNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (14 pages)
    PEIR Non-technical summary - Section 07 - Hammersmith Pumping StationNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (14 pages)
    PEIR Non-technical summary - Section 08 - Barn ElmsNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (14 pages)
    PEIR Non-technical summary - Section 09 - Putney Bridge ForeshoreNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (16 pages)
    PEIR Non-technical summary - Section 10 - Dormay StreetNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (14 pages)
    PEIR Non-technical summary - Section 11 - King George's ParkNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (14 pages)
    PEIR Non-technical summary - Section 12 - Carnwath Road RiversideNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (15 pages)
    PEIR Non-technical summary - Section 13 - Falconbrook Pumping StationNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (13 pages)
    PEIR Non-technical summary - Section 14 - Cremorne Wharf DepotNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (13 pages)
    PEIR Non-technical summary - Section 15 - Chelsea Embankment ForeshoreNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (14 pages)
    PEIR Non-technical summary - Section 16 - Kirtling StreetNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (14 pages)
    PEIR Non-technical summary - Section 17 - Heathwall Pumping StationNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (14 pages)
    PEIR Non-technical summary - Section 18 - Albert Embankment ForeshoreNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (17 pages)
    PEIR Non-technical summary - Section 19 - Victoria Embankment ForeshoreNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (14 pages)
    PEIR Non-technical summary - Section 20 - Blackfriars Bridge ForeshoreNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (15 pages)
    PEIR Non-technical summary - Section 21 - Chambers WharfNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (14 pages)
    PEIR Non-technical summary - Section 22 - King Edward Memorial Park ForeshoreNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (14 pages)
    PEIR Non-technical summary - Section 23 - Earl Pumping StationNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (12 pages)
    PEIR Non-technical summary - Section 24 - Deptford Church StreetNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (13 pages)
    PEIR Non-technical summary - Section 25 - Greenwich Pumping StationNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (14 pages)
    PEIR Non-technical summary - Section 26 - Abbey Mills Pumping StationNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (13 pages)
    PEIR Non-technical summary - Section 27 - Beckton Sewage Treatment WorksNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (11 pages)
    Phase two preferred scheme display boardA display board showing a map of our phase two preferred tunnel route and worksites.PDF
    (1 pages)
    Phase two scheme development reportThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (100 pages)
    Phase two scheme development report - Appendix A - Acton Storm TanksThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (24 pages)
    Phase two scheme development report - Appendix B - Hammersmith Pumping StationThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (22 pages)
    Phase two scheme development report - Appendix C - Barn ElmsThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (18 pages)
    Phase two scheme development report - Appendix D - Putney BridgeThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (14 pages)
    Phase two scheme development report - Appendix E - Dormay StreetThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (18 pages)
    Phase two scheme development report - Appendix F - King George's ParkThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (12 pages)
    Phase two scheme development report - Appendix G - Carnwath Road RiversideThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (30 pages)
    Phase two scheme development report - Appendix H - Falconbrook Pumping StationThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (18 pages)
    Phase two scheme development report - Appendix J - Cremorne Wharf DepotThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (14 pages)
    Phase two scheme development report - Appendix K - Chelsea Embankment ForeshoreThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (18 pages)
    Phase two scheme development report - Appendix L - Kirtling StreetThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (42 pages)
    Phase two scheme development report - Appendix M - Heathwall Pumping StationThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (18 pages)
    Phase two scheme development report - Appendix N - Albert Embankment ForeshoreThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (18 pages)
    Phase two scheme development report - Appendix P - Victoria Embankment ForeshoreThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (12 pages)
    Phase two scheme development report - Appendix Q - Blackfriars Bridge ForeshoreThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (10 pages)
    Phase two scheme development report - Appendix R - Chambers WharfThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (28 pages)
    Phase two scheme development report - Appendix S - King Edward Memorial Park ForeshoreThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (28 pages)
    Phase two scheme development report - Appendix T - Earl Pumping StationThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (18 pages)
    Phase two scheme development report - Appendix U - Deptford Church StreetThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (26 pages)
    Phase two scheme development report - Appendix V - Greenwich Pumping StationThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (26 pages)
    Phase two scheme development report - Appendix W - Abbey Mills Pumping StationThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (13 pages)
    Putney Bridge Foreshore - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (32 pages)
    Regulatory frameworkProject information paper explaining the regulatory framework surrounding the Thames Tunnel project.PDF
    (2 pages)
    River Boreholes Map - Carnwath Road RiversideMap showing the location of river boreholes to take place in April 2012.PDF
    (1 pages)
    River Boreholes Map - Chelsea EmbankmentMap showing location of river boreholes to take place in April 2012.PDF
    (1 pages)
    River boreholes map - Chambers WharfMap showing location of river boreholes to take place in April 2012.PDF
    (1 pages)
    River boreholes map - Victoria EmbankmentMap showing location of river boreholes to take place in April 2012.PDF
    (1 pages)
    Route and tunnel alignmentProject information paper explaining the route the tunnel will follow and its alignment.PDF
    (4 pages)
    Route to consent - How we will get permission to build the projectProject information paper explaining how we will get permission to construct and operate the Thames Tunnel.PDF
    (4 pages)
    Route to consent display boardA display board outlining the process we are following to seek permission to build the tunnel.PDF
    (1 pages)
    Settlement - Limiting ground movementProject information paper explaining the potential effects of tunnel construction on the ground above.PDF
    (2 pages)
    Shad Thames Pumping Station - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (16 pages)
    Shad Thames Pumping Station display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Shad Thames Pumping Station.PDF
    (1 pages)
    Site selection - How we chose our sitesProject information paper explaining the process of selecting potential sites for the construction and operation of the Thames Tunnel.PDF
    (4 pages)
    Site selection background technical paperAn update to the Spring 2010 issue that was part of phase one consultation, this Site selection background technical paper provides information for the site selection team about the background and the engineering requirements of the Thames Tunnel project.PDF
    (50 pages)
    Site selection methodology paperAn update to the Spring 2010 issue that was part of phase one consultation, this paper summarises the background to the project and details the methodology used to select construction sites along the route of the Thames Tunnel.PDF
    (43 pages)
    Southwark Tunnel News, January 2012The first issue of Tunnel News - a regular update about events, meetings and news for sites in the Southwark area.PDF
    (2 pages)
    Statement of community consultationOur statement on who we will consult, how we will consult and what we will consult stakeholders on regarding the Thames Tunnel, revised for phase two consultationPDF
    (1 pages)
    Summary report on phase two consultationA summary of the main report of phase two consultation for the Thames Tunnel. The document provides a summary of the responses received on the preferred tunnel route and sites, and the next steps moving forward.PDF
    (74 pages)
    Supplementary report on phase two consultation - Annex AWritten informationPDF
    (3 pages)
    Supplementary report on phase two consultation - Annex BNeed, solution, route and tunnel alignmentPDF
    (9 pages)
    Supplementary report on phase two consultation - Annex CCarnwath Road RiversidePDF
    (47 pages)
    Supplementary report on phase two consultation - Annex DChambers WharfPDF
    (7 pages)
    Supplementary report on phase two consultation - Annex EKing Edward Memorial Park ForeshorePDF
    (21 pages)
    Supplementary report on phase two consultation - Annex FConsultation processPDF
    (8 pages)
    Supplementary report on phase two consultation - Chapter 1IntroductionPDF
    (59 pages)
    Supplementary report on phase two consultation - Chapter 10Carnwath Road RiversidePDF
    (147 pages)
    Supplementary report on phase two consultation - Chapter 11Falconbrook Pumping StationPDF
    (33 pages)
    Supplementary report on phase two consultation - Chapter 12Cremorne Wharf DepotPDF
    (63 pages)
    Supplementary report on phase two consultation - Chapter 13Chelsea Embankment ForeshorePDF
    (55 pages)
    Supplementary report on phase two consultation - Chapter 14Kirtling StreetPDF
    (51 pages)
    Supplementary report on phase two consultation - Chapter 15Heathwall Pumping StationPDF
    (34 pages)
    Supplementary report on phase two consultation - Chapter 16Albert Embankment ForeshorePDF
    (46 pages)
    Supplementary report on phase two consultation - Chapter 17Victoria Embankment ForeshorePDF
    (43 pages)
    Supplementary report on phase two consultation - Chapter 18Blackfriars Bridge ForeshorePDF
    (53 pages)
    Supplementary report on phase two consultation - Chapter 19Shad Thames Pumping StationPDF
    (43 pages)
    Supplementary report on phase two consultation - Chapter 2Need, solution, route and tunnel alignmentPDF
    (96 pages)
    Supplementary report on phase two consultation - Chapter 20Chambers WharfPDF
    (112 pages)
    Supplementary report on phase two consultation - Chapter 21Earl Pumping StationPDF
    (34 pages)
    Supplementary report on phase two consultation - Chapter 22Deptford Church StreetPDF
    (83 pages)
    Supplementary report on phase two consultation - Chapter 23Greenwich Pumping StationPDF
    (50 pages)
    Supplementary report on phase two consultation - Chapter 25Bekesbourne StreetPDF
    (24 pages)
    Supplementary report on phase two consultation - Chapter 26Abbey Mills Pumping StationPDF
    (29 pages)
    Supplementary report on phase two consultation - Chapter 27Beckton Sewage Treatment WorksPDF
    (20 pages)
    Supplementary report on phase two consultation - Chapter 28Jews RowPDF
    (5 pages)
    Supplementary report on phase two consultation - Chapter 29Other worksPDF
    (5 pages)
    Supplementary report on phase two consultation - Chapter 3Other feedbackPDF
    (34 pages)
    Supplementary report on phase two consultation - Chapter 30Consultation processPDF
    (59 pages)
    Supplementary report on phase two consultation - Chapter 4Acton Storm TanksPDF
    (51 pages)
    Supplementary report on phase two consultation - Chapter 5Hammersmith Pumping StationPDF
    (39 pages)
    Supplementary report on phase two consultation - Chapter 6Barn ElmsPDF
    (92 pages)
    Supplementary report on phase two consultation - Chapter 7Putney Bridge ForeshorePDF
    (89 pages)
    Supplementary report on phase two consultation - Chapter 8Dormay StreetPDF
    (34 pages)
    Supplementary report on phase two consultation - Chapter 9King George's ParkPDF
    (48 pages)
    Supplementary report on phase two consultation – Chapter 24King Edward Memorial Park ForeshorePDF
    (107 pages)
    Timing - Proposed timescales for the projectProject information paper explaining the proposed timescales for the construction of the Thames Tunnel.PDF
    (2 pages)
    Timing display boardA display board outlining when we expect to reach project milestones.PDF
    (1 pages)
    Tower Hamlets Tunnel News, January 2012The first issue of Tunnel News - a regular update about events, meetings and news for sites in the Tower Hamlets area.  PDF
    (2 pages)
    Transport - How we will transport construction materialsProject information paper explaining how we will transport construction materials to and from our sites.PDF
    (6 pages)
    Transport display boardA display board outlining our proposed transport strategy.PDF
    (1 pages)
    Tunnelling under London display boardA display board outlining how we have choosen our preferred route.PDF
    (1 pages)
    Victoria Embankment Foreshore - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (28 pages)
    Victoria Embankment Foreshore display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Victoria Embankment Foreshore.PDF
    (1 pages)
    Written Ministerial StatementMinisterial Statement from Parliamentary Under-Secretary for Natural Environment and Fisheries (Richard Benyon) reaffirming the Government’s support for Thames Tunnel and the progress made since the last announcement on 7 September 2010.PDF
    (3 pages)
  • 8. Post-phase two [targeted] consultation (June 2012 - July 2012)
    View document Summary Download
    1. Tunnel Alignment - Overview SheetConnection tunnel to main tunnel junction: the boundaries at the end of connection tunnels where there is a junction with the main tunnel have been widened to allow the location of the junction to be optimised. Information to determine the optimum location may not be available until the main tunnel has been driven through the areas. This applies to the connection tunnels associated with the following sites: Hammersmith Pumping Station, Barn Elms, Putney Embankment Foreshore, Dormay Street, Falconbrook Pumping Station, Cremorne Wharf Depot, Chelsea Embankment Foreshore, Heathwall, Albert Embankment Foreshore and Victoria Embankment Foreshore.   Connection tunnel relocation: the boundary at the site of the connection tunnel associated with Putney Embankment Foreshore moved due to the site location move.   Protection of connection tunnel from development: the boundary at the site of the connection tunnel associated with Falconbrook Pumping Station widened in case planned residential development foundations affects tunnel alignment.   Main tunnel location: the boundary of the main tunnel has been moved closer to CSO drop shafts to reduce the length of connection tunnels that would be built Lambeth Group ground conditions. This applies to sections of the main tunnel around the following CSO sites: Heathwall Pumping Station, Albert Embankment Foreshore and Victoria Embankment Foreshore.   Main tunnel shaft adjustment: the boundaries for the main tunnel are wider at Victoria Embankment Foreshore and Blackfriars Bridge Foreshore to allow for the flexibility to adjust the location of the shaft.PDF
    (1 pages)
    Abbey Mills Pumping Station - site boundary modificationsBoundary extended up to the public highway for access; boundary extended into Prescott Channel to facilitate potential use of river transport and the associated pedestrian footpath diversion; minor boundary changes to reflect design modifications.PDF
    (1 pages)
    Acton Storm Tanks - site boundary modificationsMinor boundary changes to reflect design modifications and to reflect the need for adequate adjacent construction space to the west.PDF
    (1 pages)
    Albert Embankment Foreshire - site boundary modificationsBoundary extended to the east to include an alternative access option; boundary extended into the River Thames to facilitate scour protection works; boundary extended to include the area in front of Vauxhall Cross building to allow for utility works, construction and maintenance access; boundary extended to Albert Embankment for junction improvements. See Supplementary site information paper for more information.PDF
    (1 pages)
    Albert Embankment Foreshore - PEIR Addendum

    This document describes the potential changes at this site which are being considered in response to comments received during phase two consultation and identifies whether these have the potential to give rise to likely significant environmental effects not identified in the assessment presented at phase two consultation.

    PDF
    (27 pages)
    Albert Embankment Foreshore - supplementary site information paper

    This document explains the changes to our plans we are considering at Albert Embankment Foreshore in response to comments received during our second phase of consultation, which ended on 10 February 2012.

    PDF
    (10 pages)
    Barn Elms - PEIR Addendum

    This document describes the potential changes at this site which are being considered in response to comments received during phase two consultation and identifies whether these have the potential to give rise to likely significant environmental effects not identified in the assessment presented at phase two consultation.

    PDF
    (32 pages)
    Barn Elms - site boundary modificationsBoundary changes to reflect new construction and operational access road proposals and consequential minor junction improvements. See Supplementary site information paper for more information.PDF
    (1 pages)
    Barn Elms - supplementary site information paper

    This document explains the changes to our plans we are considering at Barn Elms in response to comments received during our second phase of consultation, which ended on 10 February 2012.

    PDF
    (7 pages)
    Beckton sewage treatment works - site boundary modificationsPDF
    (1 pages)
    Bekesbourne Street - site boundary modificationsBoundary extended into the highway to connect the two sites, to facilitate design changes and for utility diversions.PDF
    (1 pages)
    Blackfriars Bridge Foreshore - site boundary modificationsBoundary extended in the River Thames to the west to facilitate the relocation of the President boat; boundary extended in the River Thames to the east for flexibility for the relocation of Millennium Pier; boundary extended into the River Thames to facilitate scour protection works.PDF
    (1 pages)
    Carnwath Road Riverside - Site boundary modificationsMinor boundary changes to reflect design modifications to enable works to the existing Thames Path and off-site junction improvements for construction access.PDF
    (1 pages)
    Chambers Wharf - site boundary modificationsBoundary extended into the highway for utility diversion works; boundary extended into Bevington Street for off-site highway works.PDF
    (1 pages)
    Chelsea Embankment Foreshore - site boundary modificationsBoundary extended to the east to include the connection between LowLevel Sewer No. 1 and the foreshore site; boundary extended into the River Thames to facilitate scour protection works.PDF
    (1 pages)
    Cremorne Wharf Depot - Site modification changesBoundary extended into Lots Road to provide junction improvements; boundary extended into the River Thames to facilitate river transport.PDF
    (1 pages)
    Deptford Church Street - site boundary modificationsBoundary extended in the highway to facilitate highway works relating to site access and  bus stop and pedestrian crossing relocation; boundary extended to the west to provide a relocated fire assembly point for St Joseph’s School.PDF
    (1 pages)
    Design development report - AddendumThe purpose of this document is to update the site specific appendices that describe how the proposed designs at Barn Elms, Putney Embankment Foreshore and Victoria Embankment have evolved since phase two consultation.PDF
    (53 pages)
    Dormay Street - site boundary changesBoundary extended into Armoury Way and the Causeway to provide junction and highway improvements for construction access andalong the Causeway to provide construction access for light vehicles.  Boundary extended southwards in Dormay Street to provideconstruction access to/fromDormay Street. Boundary extended into Bell Lane Creek to facilitate construction works and river wall strengthening within the creek and crane oversailing of the creek, if required. Boundary extended southwards into the council depot to enable removal of a flap valve within an existing chamber.PDF
    (1 pages)
    Earl Pumping Station - site boundary modificationsMinor boundary changes within Croft Street and Chilton Grove to reflect design modifications and utility diversions.PDF
    (1 pages)
    Falconbrook Pumping Station - site boundary modificationsBoundary extended to provide off-site highway works in York Road for potential bus stop relocation; minor boundary changes to reflect design modifications.PDF
    (1 pages)
    Greenwich Pumping Station - site boundary modificationsBoundary extended to include the pumping station and to facilitate minor highway works; minor boundary realignments to the south of the site.PDF
    (1 pages)
    Hammersmith Pumping Station - Site boundary modificationBoundary extended into Chancellor’s Road to enable the rising main to be connected with the existing sewer; boundary extended into Distillery Road to create access and accommodate kerb realignment; minor boundary changes to the west to off-set the area lost due to the required set back along Distillery Road.PDF
    (1 pages)
    Heathwall Pumping Station - site boundary modificationsBoundary extended to the west to facilitate the temporary relocation of Battersea Barge and to accommodate the realignment and enlargement of the permanent foreshore structure; boundary extended to the east to facilitate access forconstruction equipment and for any necessary ground treatment works and to facilitate access to the South West Storm Relief connection culvert.PDF
    (1 pages)
    King Edward Memorial Park Foreshore - site boundary changesBoundary extended into the highway for junction improvements and utility diversions; boundary extended around the playground in order to create a larger usable space during construction and to provide a new relocated playground; minor boundary realignments.PDF
    (1 pages)
    King George’s Park - site boundary modificationsBoundary extended into Neville Gill Close for construction access andhighway and junction improvements; boundary extended near the existing park entrance to facilitate amended landscaping proposals.PDF
    (1 pages)
    Kirtling Street - site boundary modificationsBoundary extended into the River Thames to provide more flexibility for river transport and to enable the potential use of Cringle Street during construction.PDF
    (1 pages)
    PEIR Figures - Albert Embankment Foreshore - Part 1Figures to accompany the Preliminary environmental information addendum.PDF
    (6 pages)
    PEIR Figures - Albert Embankment Foreshore - Part 2Figures to accompany the Preliminary environmental information report.PDF
    (7 pages)
    PEIR Figures - Barn Elms - Part 1Figures to accompany the Preliminary environmental information addendum.PDF
    (5 pages)
    PEIR Figures - Barn Elms - Part 2Figures to accompany the Preliminary environmental information addendum.PDF
    (7 pages)
    PEIR Figures - Putney Embankment Foreshore - Part 1Figures to accompany the Preliminary environmental information addendum.PDF
    (8 pages)
    PEIR Figures - Putney Embankment Foreshore - Part 2Figures to accompany the Preliminary environmental information addendum.PDF
    (8 pages)
    PEIR Figures - Victoria Embankment Foreshore - Part 1Figures to accompany the Preliminary environmental information addendum.PDF
    (6 pages)
    PEIR Figures - Victoria Embankment Foreshore - Part 2Figures to accompany the Preliminary environmental information addendum.PDF
    ( pages)
    Putney Embankment Foreshore - PEIR Addendum

    This document describes the potential changes at this site which are being considered in response to comments received during phase two consultation and identifies whether these have the potential to give rise to likely significant environmental effects not identified in the assessment presented at phase two consultation.

    PDF
    (41 pages)
    Putney Embankment Foreshore - site boundary modificationsPermanent works boundary extended to accommodate relocation of the permanent platform; need for scour protection to Putney Pier; potential to accommodate re-located residential mooring during construction and to accommodate necessary construction space and scour protection under and around Putney Bridge.  Temporary Slipway boundary extended to accommodate river access for construction, potential temporary construction effects on existing moorings and to accommodate construction parking and access along the Embankment. See Supplementary site information paper for more information.PDF
    (1 pages)
    Putney Embankment Foreshore - supplementary site information paper 

    This document explains the changes to our plans we are considering at Putney Embankment Foreshore in response to comments received during our second phase of consultation, which ended on 10 February 2012.

     
    PDF
    (19 pages)
    Report on post phase two consultationA summary of the responses received during targeted consultation on alternative design solutions at four of our proposed sites, and Section 42 consultation on ground water abstraction licences and on various changes to site boundaries and the alignment of the main tunnel.PDF
    (335 pages)
    Shad Thames Pumping Station - site boundary modificationsMinor boundary changes to reflect design modifications and access requirements.PDF
    (1 pages)
    Supplementary book of plansPDF
    ( pages)
    Targeted consultation - drop-in exhibitions leafletPDF
    (1 pages)
    Targeted consultation - project information paperProject information paper explaining why we are carrying out targeted consultation and what we will be consulting on.  PDF
    (2 pages)
    Tunnel Alignment - sheet 1PDF
    (1 pages)
    Tunnel Alignment - sheet 10PDF
    (1 pages)
    Tunnel Alignment - sheet 11PDF
    (1 pages)
    Tunnel Alignment - sheet 12PDF
    (1 pages)
    Tunnel Alignment - sheet 13PDF
    (1 pages)
    Tunnel Alignment - sheet 14PDF
    (1 pages)
    Tunnel Alignment - sheet 15PDF
    (1 pages)
    Tunnel Alignment - sheet 16PDF
    (1 pages)
    Tunnel Alignment - sheet 17PDF
    (1 pages)
    Tunnel Alignment - sheet 18PDF
    (1 pages)
    Tunnel Alignment - sheet 19PDF
    (1 pages)
    Tunnel Alignment - sheet 2PDF
    (1 pages)
    Tunnel Alignment - sheet 20PDF
    (1 pages)
    Tunnel Alignment - sheet 21PDF
    (1 pages)
    Tunnel Alignment - sheet 22PDF
    (1 pages)
    Tunnel Alignment - sheet 23PDF
    (1 pages)
    Tunnel Alignment - sheet 24PDF
    (1 pages)
    Tunnel Alignment - sheet 25PDF
    (1 pages)
    Tunnel Alignment - sheet 26PDF
    (1 pages)
    Tunnel Alignment - sheet 27PDF
    (1 pages)
    Tunnel Alignment - sheet 28PDF
    (1 pages)
    Tunnel Alignment - sheet 29PDF
    (1 pages)
    Tunnel Alignment - sheet 3PDF
    (1 pages)
    Tunnel Alignment - sheet 30PDF
    (1 pages)
    Tunnel Alignment - sheet 31PDF
    (1 pages)
    Tunnel Alignment - sheet 32PDF
    (1 pages)
    Tunnel Alignment - sheet 33PDF
    (1 pages)
    Tunnel Alignment - sheet 34PDF
    (1 pages)
    Tunnel Alignment - sheet 35PDF
    (1 pages)
    Tunnel Alignment - sheet 36PDF
    (1 pages)
    Tunnel Alignment - sheet 37PDF
    (1 pages)
    Tunnel Alignment - sheet 38PDF
    (1 pages)
    Tunnel Alignment - sheet 39PDF
    (1 pages)
    Tunnel Alignment - sheet 4PDF
    (1 pages)
    Tunnel Alignment - sheet 40PDF
    (1 pages)
    Tunnel Alignment - sheet 41PDF
    (1 pages)
    Tunnel Alignment - sheet 42PDF
    (1 pages)
    Tunnel Alignment - sheet 43PDF
    (1 pages)
    Tunnel Alignment - sheet 44PDF
    (1 pages)
    Tunnel Alignment - sheet 45PDF
    (1 pages)
    Tunnel Alignment - sheet 46PDF
    (1 pages)
    Tunnel Alignment - sheet 47PDF
    (1 pages)
    Tunnel Alignment - sheet 48PDF
    (1 pages)
    Tunnel Alignment - sheet 49PDF
    ( pages)
    Tunnel Alignment - sheet 5PDF
    (1 pages)
    Tunnel Alignment - sheet 50PDF
    ( pages)
    Tunnel Alignment - sheet 51PDF
    ( pages)
    Tunnel Alignment - sheet 52PDF
    ( pages)
    Tunnel Alignment - sheet 53PDF
    ( pages)
    Tunnel Alignment - sheet 54PDF
    ( pages)
    Tunnel Alignment - sheet 55PDF
    ( pages)
    Tunnel Alignment - sheet 56PDF
    ( pages)
    Tunnel Alignment - sheet 57PDF
    ( pages)
    Tunnel Alignment - sheet 58PDF
    ( pages)
    Tunnel Alignment - sheet 59PDF
    ( pages)
    Tunnel Alignment - sheet 7PDF
    (1 pages)
    Tunnel Alignment - sheet 8PDF
    (1 pages)
    Tunnel Alignment - sheet 9PDF
    (1 pages)
    Victoria Embankment Foreshore - PEIR Addendum

    This document describes the potential changes at this site which are being considered in response to comments received during phase two consultation and identifies whether these have the potential to give rise to likely significant environmental effects not identified in the assessment presented at phase two consultation.

    PDF
    (25 pages)
    Victoria Embankment Foreshore - site boundary modificationsBoundary extended in the River Thames to facilitate options for the relocation of the Tattershall Castle and facilitate scour protection works; minor boundary changes to reflect design modifications to both the temporary and permanent layout. See Supplementary site information paper for more information.PDF
    (1 pages)
    Victoria Embankment Foreshore - supplementary site information paper

    This document explains the changes to our plans we are considering at Victoria Embankment Foreshore in response to comments received during our second phase of consultation, which ended on 10 February 2012.

    PDF
    (18 pages)
  • 9. Section 48 Publicity (July 2012 - Oct 2012)
    View document Summary Download
    Section 48 - Notice of applicationPDF
    (1 pages)
    Section 48 Code of construction practiceThis Code of construction practice (CoCP) is draft and continuing to develop. This document is being provided voluntarily at this stage so that stakeholders have an indication as to the activities that are anticipated to be undertaken as part of the project to manage construction impacts on the environment.PDF
    (92 pages)
    Section 48 Pre-application publicity reportThis report provides an overview and summary of the documents, plans and maps we are publicising and sets out where to find the full information and how to respond to it. It also explains those matters which we propose to include in our proposed application and outlines the next steps in the process.PDF
    (47 pages)
    Section 48 Project description & environmental information reportThis report provides a description of the project, including the activities that will take place during the construction and operational phases. Environmental effects are described to assist stakeholders in understanding the nature and location of the proposed development.PDF
    (281 pages)
    Section 48 Proposed schedule of worksPDF
    (34 pages)
    Section 48 Transport strategyThis report explains how we have reviewed the options for the transport of construction materials, including excavated material to and from our construction sites.PDF
    (16 pages)
    Volume 1 - ContentsPDF
    (2 pages)
    Volume 1 - Section 1Project-wide plansPDF
    (60 pages)
    Volume 1 - Section 2Project-wide plansPDF
    (47 pages)
    Volume 1 Main report on site selection processThis report explains our approach in identifying the sites required to construct and operate the project. It describes each stage of the site selection process (as set out in our site selection methodology), how the methodology was implemented and the results of the process. In addition to an overview of the site selection process to date, it includes a post phase two consultation review of all the proposed sites and tunnel drives that make up the project in order to ensure that we have identified a suitable network of sites across the route for the Section 48 publicity   stage.PDF
    (204 pages)
    Volume 2 - ContentsPDF
    (3 pages)
    Volume 2 - Section 11 - Kensington & ChelseaPlans for Kensington & ChelseaPDF
    (13 pages)
    Volume 2 - Section 12 - Kensington & ChelseaPlans for Kensington & ChelseaPDF
    (18 pages)
    Volume 2 - Section 16 - WestminsterPlans for WestminsterPDF
    (17 pages)
    Volume 2 - Section 3 - EalingPlans for EalingPDF
    (15 pages)
    Volume 2 - Section 4 - Hammersmith & FulhamPlans for Hammersmith & FulhamPDF
    (13 pages)
    Volume 2 - Section 7 - Hammersmith & FulhamPlans for Hammersmith & FulhamPDF
    (15 pages)
    Volume 2 General appendicesThis volume contains the full text of following background documents: a. Site selection methodology paper (Summer 2011) b. Site selection background technical paper (Summer 2011).PDF
    (104 pages)
    Volume 3 - ContentsPDF
    (3 pages)
    Volume 3 - Section 10 - WandsworthPlans for WandsworthPDF
    (14 pages)
    Volume 3 - Section 13 - WandsworthPlans for WandsworthPDF
    (14 pages)
    Volume 3 - Section 14 - WandsworthPlans for WandsworthPDF
    (14 pages)
    Volume 3 - Section 5 - RichmondPlans for RichmondPDF
    (18 pages)
    Volume 3 - Section 6 - WandsworthPlans for WandsworthPDF
    (24 pages)
    Volume 3 - Section 8 - WandsworthPlans for WandsworthPDF
    (13 pages)
    Volume 3 - Section 9 - WandsworthPlans for WandsworthPDF
    (13 pages)
    Volume 3 Western site appendicesThis volume sets out the site selection process that was followed to identify the most suitable CSO and main tunnel sites in the western section of the main tunnel.PDF
    (200 pages)
    Volume 4 - ContentsPDF
    (5 pages)
    Volume 4 - Section 15 - LambethPlans for LambethPDF
    (19 pages)
    Volume 4 - Section 18 - SouthwarkPlans for SouthwarkPDF
    (14 pages)
    Volume 4 - Section 20 - LewishamPlans for LewishamPDF
    (13 pages)
    Volume 4 - Section 21 - LewishamPlans for LewishamPDF
    (13 pages)
    Volume 4 - Section 22 - GreenwichPlans for GreenwichPDF
    (16 pages)
    Volume 4 Central site appendicesThis volume sets out the site selection process that was followed to identify the most suitable CSO and main tunnel sites in the central section of the main tunnel.PDF
    (158 pages)
    Volume 5 - ContentsPDF
    (5 pages)
    Volume 5 - Section 17 - City of LondonPlans for City of LondonPDF
    (30 pages)
    Volume 5 - Section 23 - Tower HamletsPlans for Tower HamletsPDF
    (15 pages)
    Volume 5 - Section 24 - Tower HamletsPlans for Tower HamletsPDF
    (7 pages)
    Volume 5 - Section 25 - NewhamPlans for NewhamPDF
    (13 pages)
    Volume 5 - Section 26 - NewhamPDF
    (11 pages)
    Volume 5 Eastern site appendicesThis volume sets out the site selection process that was followed to identify the most suitable CSO and main tunnel sites in the eastern section of the main tunnel.PDF
    (168 pages)
  • 10. Post acceptance (From April 2013)
    View document Summary Download
    1 Covering LetterApplication for Certificates in respect of compulsory acquisition of open space and rights over open space.PDF
    (2 pages)
    2 Supporting StatementApplication for Certificates in respect of compulsory acquisition of open space and rights over open space.PDF
    (154 pages)
    2a Appendix A – Schedule of Potential SitesApplication for Certificates in respect of compulsory acquisition of open space and rights over open space.PDF
    (9 pages)
    2b Appendix B(i) – Land Based PlansApplication for Certificates in respect of compulsory acquisition of open space and rights over open space.PDF
    (9 pages)
    2c Appendix B(ii) – Foreshore PlansApplication for Certificates in respect of compulsory acquisition of open space and rights over open space.PDF
    (5 pages)
    4 Schedule of LandApplication for Certificates in respect of compulsory acquisition of open space and rights over open space.PDF
    (6 pages)
    5 Plans of Affected SitesApplication for Certificates in respect of compulsory acquisition of open space and rights over open space.PDF
    (10 pages)
    6 Supplementary Supporting InformationApplication for Certificates in respect of compulsory acquisition of open space and rights over open space.PDF
    (16 pages)
    7 Clarifications regarding valuation referencesApplication for Certificates in respect of compulsory acquisition of open space and rights over open space.PDF
    (10 pages)
    An explanatory note: Site Suitability Reports and Engineering Options ReportsThe Site Suitability Reports and Engineering Options Reports are historic reports that informed the site selection process for the proposed Thames Tideway Tunnel. These reports are summarised in report 7.05 Final Report on Site Selection process, submitted to the Planning Inspectorate with our application for development consent in February 2013.PDF
    (1 pages)
    Code of Construction Practice Part A: General Requirements - Comparite against 23 September 2013Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (160 pages)
    Code of Construction Practice Part A: General Requirements - Comparite against 28 February 2013Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (133 pages)
    Code of Construction Practice Part A: General Requirements - Comparite against 3 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (122 pages)
    Code of Construction Practice Part A: General Requirements - Revised 12 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (124 pages)
    Code of Construction Practice Part A: General Requirements - Revised 13 January 2014Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (121 pages)
    Code of Construction Practice Part A: General Requirements - Revised 3 February 2014Draft submitted to the Planning Inspectorate on 3 February 2014PDF
    (124 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Abbey Mills Pumping Station (Comparite against 23 September 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (14 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Abbey Mills Pumping Station (Comparite against 28 February 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (12 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Abbey Mills Pumping Station (Revised 13 January 2014)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (11 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Abbey Mills Pumping Station - Comparite against 3 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (10 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Abbey Mills Pumping Station - Revised 12 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (9 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Acton Storm Tanks - Revised 12 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (10 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Acton Storm Tanks (Comparite against 23 September 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (14 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Acton Storm Tanks (Comparite against 28 February 2013 )Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (14 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Acton Storm Tanks (Revised 13 January 2014)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (12 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Acton Storm Tanks (Revised 3 February 2014)Draft submitted to the Planning Inspectorate on 3 February 2014PDF
    (12 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Acton Storm Tanks - Comparite against 3 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (11 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Albert Embankment Foreshore (Comparite against 23 September 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (16 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Albert Embankment Foreshore (Comparite against 28 February 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (16 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Albert Embankment Foreshore (Revised 13 January 2014)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (13 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Albert Embankment Foreshore (Revised 3 February 2014)Draft submitted to the Planning Inspectorate on 3 February 2014PDF
    (13 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Albert Embankment Foreshore - Comparite against 3 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (12 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Albert Embankment Foreshore - Revised 12 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (11 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Barn Elms (Comparite against 23 September 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (15 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Barn Elms (Revised 13 January 2014)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (13 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Barn Elms (Revised 3 February 2014)Draft submitted to the Planning Inspectorate on 3 February 2014PDF
    (14 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Barn Elms - Comparite against 3 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (13 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Barn Elms - Revised 12 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (11 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Beckton Sewage Treatment Works (Comparite against 23 September 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (13 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Beckton Sewage Treatment Works (Comparite against 28 February 2013 )Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (12 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Beckton Sewage Treatment Works (Revised 13 January 2014)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (11 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Beckton Sewage Treatment Works (Revised 3 February 2014)Draft submitted to the Planning Inspectorate on 3 February 2014PDF
    (11 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Beckton Sewage Treatment Works - Comparite against 3 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (11 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Beckton Sewage Treatment Works - Revised 12 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (9 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Bekesbourne Street (Comparite against 23 September 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (12 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Bekesbourne Street (Comparite against 28 February 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (12 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Bekesbourne Street (Revised 13 January 2014)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (11 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Bekesbourne Street (Revised 3 February 2014)Code of Construction Practice Part B: Site Specific Requirements - Beckton Sewage Treatment Works (Revised 3 February 2014)PDF
    (11 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Bekesbourne Street - Comparite against 3 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (11 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Bekesbourne Street - Revised 12 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (9 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Blackfriars Bridge Foreshore (Comparite against 23 September 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (18 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Blackfriars Bridge Foreshore (Comparite against 28 February 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (18 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Blackfriars Bridge Foreshore (Revised 13 January 2014)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (15 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Blackfriars Bridge Foreshore (Revised 3 February 2014)Draft submitted to the Planning Inspectorate on 3 February 2014PDF
    (15 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Blackfriars Bridge Foreshore - Comparite against 3 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (15 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Blackfriars Bridge Foreshore - Revised 12 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (13 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Carnwath Road Riverside (Comparite against 23 September 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (15 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Carnwath Road Riverside (Comparite against 28 February 2013 )Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (15 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Carnwath Road Riverside (Revised 13 January 2014)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (13 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Carnwath Road Riverside (Revised 3 February 2014)Draft submitted to the Planning Inspectorate on 3 February 2014PDF
    (13 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Carnwath Road Riverside - Comparite against 3 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (12 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Carnwath Road Riverside - Revised 12 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (11 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Chambers Wharf (Comparite against 23 September 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (16 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Chambers Wharf (Comparite against 28 February 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (16 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Chambers Wharf (Revised 13 January 2014)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (14 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Chambers Wharf - Comparite against 3 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (14 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Chambers Wharf - Revised 12 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (12 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Chelsea Embankment Foreshore (Comparite against 23 September 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (15 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Chelsea Embankment Foreshore (Comparite against 28 February 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (15 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Chelsea Embankment Foreshore (Revised 13 January 2014)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (12 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Chelsea Embankment Foreshore (Revised 3 February 2014)Draft submitted to the Planning Inspectorate on 3 February 2014PDF
    (13 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Chelsea Embankment Foreshore - Comparite against 3 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (12 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Chelsea Embankment Foreshore - Revised 12 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (11 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Cremorne Wharf Depot (Comparite against 23 September 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (13 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Cremorne Wharf Depot (Comparite against 28 February 2013 )Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (13 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Cremorne Wharf Depot (Revised 13 January 2014)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (12 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Cremorne Wharf Depot (Revised 3 February 2014)Draft submitted to the Planning Inspectorate on 3 February 2014PDF
    (12 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Cremorne Wharf Depot - Revised 12 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (10 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Deptford Church Street (Comparite against 23 September 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (15 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Deptford Church Street (Comparite against 28 February 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (15 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Deptford Church Street (Revised 13 January 2014)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (12 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Deptford Church Street (Revised 3 February 2014)Draft submitted to the Planning Inspectorate on 3 February 2014PDF
    (12 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Deptford Church Street - Revised 12 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (11 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Deptford Church Street Comparite against 3 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (13 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Dormay Street (Comparite against 28 February 2013 )Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (13 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Dormay Street (Revised 13 January 2014)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (12 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Dormay Street (Revised 3 February 2014)Draft submitted to the Planning Inspectorate on 3 February 2014PDF
    (12 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Dormay Street - Comparite against 3 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (11 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Dormay Street - Revised 12 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (10 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Earl Pumping Station (Comparite against 23 September 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (14 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Earl Pumping Station (Comparite against 28 February 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (15 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Earl Pumping Station (Revised 13 January 2014)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (12 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Earl Pumping Station (Revised 3 February 2014)Draft submitted to the Planning Inspectorate on 3 February 2014PDF
    (12 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Earl Pumping Station - Comparite against 3 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (11 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Earl Pumping Station - Revised 12 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (10 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Falconbrook Pumping Station (Comparite against 23 September 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (13 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Falconbrook Pumping Station (Comparite against 28 February 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (13 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Falconbrook Pumping Station (Revised 13 January 2014)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (12 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Falconbrook Pumping Station (Revised 3 February 2014)Draft submitted to the Planning Inspectorate on 3 February 2014PDF
    (12 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Falconbrook Pumping Station - 3 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (10 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Falconbrook Pumping Station - Revised 12 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (10 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Greenwich Pumping Station (Comparite against 23 September 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (14 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Greenwich Pumping Station (Comparite against 28 February 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (14 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Greenwich Pumping Station (Revised 13 January 2014)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (12 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Greenwich Pumping Station (Revised 3 February 2014)Draft submitted to the Planning Inspectorate on 3 February 2014PDF
    (12 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Greenwich Pumping Station - Revised 12 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (10 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Greenwich Pumping Station Comparite against 3 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (10 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Hammersmith Pumping Station (Comparite against 23 September 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (13 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Hammersmith Pumping Station (Comparite against 28 February 2013 )Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (13 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Hammersmith Pumping Station (Revised 3 February 2014)Draft submitted to the Planning Inspectorate on 3 February 2014PDF
    (11 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Hammersmith Pumping Station - Comparite against 3 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (10 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Hammersmith Pumping Station - Revised 12 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (9 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Heathwall Pumping Station (Comparite against 28 February 2013 )Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (14 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Heathwall Pumping Station (Revised 3 February 2014)Draft submitted to the Planning Inspectorate on 3 February 2014PDF
    (12 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Heathwall Pumping Station - Comparite against 3 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (11 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Heathwall Pumping Station - Revised 12 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (10 pages)
    Code of Construction Practice Part B: Site Specific Requirements - King Edward Memorial Park Foreshore (Comparite against 23 September 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (16 pages)
    Code of Construction Practice Part B: Site Specific Requirements - King Edward Memorial Park Foreshore (Comparite against 28 February 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (16 pages)
    Code of Construction Practice Part B: Site Specific Requirements - King Edward Memorial Park Foreshore (Revised 13 January 2014)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (13 pages)
    Code of Construction Practice Part B: Site Specific Requirements - King Edward Memorial Park Foreshore - 3 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (13 pages)
    Code of Construction Practice Part B: Site Specific Requirements - King Edward Memorial Park Foreshore - Revised 12 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (12 pages)
    Code of Construction Practice Part B: Site Specific Requirements - King George's Park (Comparite against 23 September 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (14 pages)
    Code of Construction Practice Part B: Site Specific Requirements - King George's Park (Comparite against 28 FebruaryDraft submitted to the Planning Inspectorate on 13 January 2014PDF
    (14 pages)
    Code of Construction Practice Part B: Site Specific Requirements - King George's Park (Revised 13 January 2014)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (11 pages)
    Code of Construction Practice Part B: Site Specific Requirements - King George's Park (Revised 3 February 2014)Draft submitted to the Planning Inspectorate on 3 February 2014PDF
    (11 pages)
    Code of Construction Practice Part B: Site Specific Requirements - King George's Park - Comparite against 3 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (10 pages)
    Code of Construction Practice Part B: Site Specific Requirements - King George's Park - Revised 12 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (9 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Kirtling Street (Comparite against 23 September 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (14 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Kirtling Street (Revised 13 January 2014)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (13 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Kirtling Street (Revised 3 February 2014)Draft submitted to the Planning Inspectorate on 3 February 2014PDF
    (13 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Kirtling Street - Comparite against 3 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (12 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Kirtling Street - Revised 12 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (11 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Putney Embankment Foreshore (Comparite against 23 September 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (17 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Putney Embankment Foreshore (Revised 3 February 2014)Draft submitted to the Planning Inspectorate on 3 February 2014PDF
    (15 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Putney Embankment Foreshore - Comparite against 3 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (14 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Putney Embankment Foreshore - Revised 12 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (13 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Shad Thames Pumping Station (Comparite against 23 September 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (14 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Shad Thames Pumping Station (Comparite against 28 February 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (14 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Shad Thames Pumping Station (Revised 13 January 2014)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (12 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Shad Thames Pumping Station (Revised 3 February 2014)Draft submitted to the Planning Inspectorate on 3 February 2014PDF
    (12 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Shad Thames Pumping Station - Comparite against 3 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (11 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Shad Thames Pumping Station - Revised 12 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (10 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Victoria Embankment Foreshore (Comparite against 23 September 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (15 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Victoria Embankment Foreshore (Comparite against 28 February 2013)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (14 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Victoria Embankment Foreshore (Revised 13 January 2014)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (12 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Victoria Embankment Foreshore (Revised 3 February 2014)Draft submitted to the Planning Inspectorate on 3 February 2014PDF
    (12 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Victoria Embankment Foreshore - Comparite against 3 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (11 pages)
    Code of Construction Practice Part B: Site Specific Requirements - Victoria Embankment Foreshore - Revised 12 February 2014Draft submitted to the Planning Inspectorate on 12 February 2014PDF
    (10 pages)
    Compensation - Help and advice for you - January 2014This leaflet gives an overview of how we can help should you be affected by our proposals. We are introducing a free independent advice service who will answer any questions you may have about compensation.PDF
    (3 pages)
    Draft Legal agreement with river regulators (PLA, EA, MMO)Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (31 pages)
    Draft S106 - City of LondonDraft submitted to the Planning Inspectorate on 13 January 2014PDF
    (56 pages)
    Draft S106 - City of WestminsterDraft submitted to the Planning Inspectorate on 13 January 2014PDF
    (53 pages)
    Draft S106 - LB EalingDraft submitted to the Planning Inspectorate on 13 January 2014PDF
    (30 pages)
    Draft S106 - LB GreenwichDraft submitted to the Planning Inspectorate on 13 January 2014PDF
    (30 pages)
    Draft S106 - LB Hammersmith and FulhamDraft submitted to the Planning Inspectorate on 13 January 2014PDF
    (46 pages)
    Draft S106 - LB LambethDraft submitted to the Planning Inspectorate on 13 January 2014PDF
    (39 pages)
    Draft S106 - LB LewishamDraft submitted to the Planning Inspectorate on 13 January 2014PDF
    (52 pages)
    Draft S106 - LB NewhamDraft submitted to the Planning Inspectorate on 13 January 2014PDF
    (25 pages)
    Draft S106 - LB SouthwarkDraft submitted to the Planning Inspectorate on 13 January 2014PDF
    (38 pages)
    Draft S106 - LB Tower HamletsDraft submitted to the Planning Inspectorate on 13 January 2014PDF
    (59 pages)
    Draft S106 - LB WandsworthDraft submitted to the Planning Inspectorate on 13 January 2014PDF
    (68 pages)
    Draft S106 - RB Kensington and ChelseaDraft submitted to the Planning Inspectorate on 13 January 2014PDF
    (42 pages)
    Draft S106 Unilateral Undertaking for securing noise mitigation and compensation policiesDraft submitted to the Planning Inspectorate on 13 January 2014PDF
    (25 pages)
    Draft Separate Legal Agreement associated with s106 - various actions in relation to securing noise mitigation and compensation policies in advance of the grant of the DCODraft submitted to the Planning Inspectorate on 13 January 2014PDF
    (35 pages)
    Drafting notes relating to updated draft DCODraft submitted to the Planning Inspectorate on 13 January 2014PDF
    (12 pages)
    Engineering Options Report and AppendicesSpring 2010 PDF
    (64 pages)
    Engineering Options Report and AppendicesSpring 2010PDF
    (44 pages)
    Engineering Options Report; Abbey Mills route and AppendicesSummer 2011PDF
    (23 pages)
    Engineering Options Report; Abbey Mills route and AppendicesSummer 2011PDF
    (74 pages)
    Engineering Options Report; Abbey Mills route and AppendicesSpring 2012PDF
    (25 pages)
    Engineering Options Report; Abbey Mills route and AppendicesSpring 2012PDF
    (79 pages)
    Exceptional Hardship ProcedureSubmitted to the Planning Inspectorate on 13 January 2014 PLEASE NOTE THIS HAS SINCE BEEN REPLACED WITH A MORE RECENT VERSION AVAILABLE HERE.PDF
    (24 pages)
    Exceptional Hardship ProcedureUpdated version submitted to the Planning Inspectorate on 12 February 2014.PDF
    (23 pages)
    Explanatory note for changes to the Code of Construction PracticeThis document is best viewed as a download.PDF
    (23 pages)
    Hearing NoticeFurther notice of additional issue specific, open floor and complusory acquisition hearingsPDF
    (1 pages)
    Hearing noticeNotice of issue-specific, open-floor and compulsory acquisition hearingsPDF
    (1 pages)
    Hearing noticeFurther notice of an open floor hearingPDF
    (1 pages)
    Hearing noticeNotice of application for a closed hearing under section 95A of the Planning Act 2008PDF
    (1 pages)
    Houseboat Compensation PolicyCompensation policy for houseboatsPDF
    (18 pages)
    Non-statutory Off-site Mitigation and Compensation PolicySubmitted to the Planning Inspectorate on 13 January 2014. PLEASE NOTE THIS HAS SINCE BEEN REPLACED WITH A MORE RECENT VERSION AVAILABLE HERE.PDF
    (41 pages)
    Non-statutory Off-site Mitigation and Compensation PolicyUpdated version submitted to the Planning Inspectorate on 12 February 2014.PDF
    (55 pages)
    Notice of proposalNotice of proposal to issue certificates under Sections 131 (4A) and 132(3) of the Planning Act 2008.PDF
    (1 pages)
    Notice of public open inquiryNotice of public open inquiry regarding the proposal to issue certificates under Sections 131 (4A) and 132(3) of the Planning Act 2008.PDF
    (2 pages)
    S106 Summary and Explanatory Note in Relation to Securing Noise Mitigation and Compensation PoliciesDraft submitted to the Planning Inspectorate on 13 January 2014PDF
    (6 pages)
    Section 56: Notice of accepted applicationVisit the Planning Inspectorate website to view our application and register as an interested party. Note: This page will open in a new window.PDF
    (1 pages)
    Settlement DeedUpdated version submitted to the Planning Inspectorate on 12 February 2014.PDF
    (15 pages)
    Settlement Information PaperSubmitted to the Planning Inspectorate on 13 January 2014 PLEASE NOTE THIS HAS SINCE BEEN REPLACED WITH A MORE RECENT VERSION AVAILABLE HERE.PDF
    (33 pages)
    Settlement Information PaperUpdated version submitted to the Planning Inspectorate on 12 February 2014.PDF
    (30 pages)
    Site Suitability Report - C01XT (Car park, Welstead Way)Spring 2010PDF
    (61 pages)
    Site Suitability Report - C04XA (Foreshore, adjacent to Chancellors Wharf)Spring 2010PDF
    (63 pages)
    Site Suitability Report - C04XG (Frank Banfield Park)Spring 2010PDF
    (63 pages)
    Site Suitability Report - C04XN (Hammersmith Pumping Station)Autumn 2011PDF
    (81 pages)
    Site Suitability Report - C04XP (Thames Water Depot and Pumping Station, Chancellors Road)Autumn 2011PDF
    (108 pages)
    Site Suitability Report - C05XA (Foreshore, adjacent to Barn Elms)Spring 2010PDF
    (69 pages)
    Site Suitability Report - C05XD (Boat repair, off Putney Embankment)Spring 2010PDF
    (69 pages)
    Site Suitability Report - C05XE (Leaders Gardens, Putney Embankment)Spring 2010PDF
    (70 pages)
    Site Suitability Report - C05XQ (Barn Elms)Autumn 2011PDF
    (85 pages)
    Site Suitability Report - C06XK (Putney Embankment Foreshore)Spring 2012PDF
    (93 pages)
    Site Suitability Report - C06XL (Lower Richmond Road Foreshore)Spring 2012PDF
    (80 pages)
    Site Suitability Report - C06XM (Putney Wharf Foreshore)Spring 2012PDF
    (92 pages)
    Site Suitability Report - C07AB (LB Wandsworth, maintenance depot, Dormay Street)Spring 2010PDF
    (65 pages)
    Site Suitability Report - C07AF (Offices, Dormay Street) Note at phase one consultation named: Bell Lane CreekSpring 2010PDF
    (65 pages)
    Site Suitability Report - C07AR/CL008 (Dormay Street)Autumn 2011PDF
    (80 pages)
    Site Suitability Report - C07BD (Car park off Broomhill Road to rear of flats facing onto Buckhold Road)Spring 2010PDF
    (66 pages)
    Site Suitability Report - C07BF (King George's Park, Buckhold Road)Spring 2010PDF
    (74 pages)
    Site Suitability Report - C09XA (Foreshore, near London Heliport, Lombard Road)Spring 2010PDF
    (64 pages)
    Site Suitability Report - C09XC (Car park, Bridges Court and York Road) Note at phase one consultation named: Bridges Court Car ParkSpring 2010PDF
    (66 pages)
    Site Suitability Report - C09XD (York Gardens, adjacent to York Road)Spring 2010PDF
    ( pages)
    Site Suitability Report - C09XE (York Gardens, adjacent to Pennethorne House)Spring 2010PDF
    (64 pages)
    Site Suitability Report - C09XH (Falconbrook Pumping Station)Autumn 2011PDF
    (77 pages)
    Site Suitability Report - C10XA (Foreshore, Cremorne Wharf and Lots Road Pumping Station) Note at phase one consultation named: Cremorne Wharf ForeshoreSpring 2010PDF
    (80 pages)
    Site Suitability Report - C10XB (Cremorne Wharf Depot)Autumn 2011PDF
    (84 pages)
    Site Suitability Report - C14XH/CLLAG (Ranelagh Gardens)Autumn 2011PDF
    (121 pages)
    Site Suitability Report - C14XJ/CLLAH (Chelsea Embankment Foreshore (opposite the Bull Ring Gate))Autumn 2011PDF
    (83 pages)
    Site Suitability Report - C16XA (Foreshore, adjacent to Heathwall Pumping Station, Nine Elms Lane)Spring 2010PDF
    (67 pages)
    Site Suitability Report - C16XB (Heathwall Pumping Station)Autumn 2011PDF
    (81 pages)
    Site Suitability Report - C19XA (Foreshore, adjacent to St George's Wharf and Vauxhall Bridge)Spring 2010PDF
    (75 pages)
    Site Suitability Report - C20XA (Foreshore, adjacent to SIS Building and Vauxhall Bridge)Spring 2010PDF
    (77 pages)
    Site Suitability Report - C20XH (Open space, Claylands Road)Spring 2010PDF
    (68 pages)
    Site Suitability Report - C20XS (Foreshore, adjacent to offices, Albert Embankment) Note at phase one consultation named: Albert Embankment ForeshoreSpring 2010PDF
    (74 pages)
    Site Suitability Report - C22XA/CLLAC (Foreshore, adjacent Victoria Embankment Gardens, Victoria Embankment)Spring 2010PDF
    (84 pages)
    Site Suitability Report - C22XC/CLLAD (Victoria Embankment Gardens)Spring 2010PDF
    (80 pages)
    Site Suitability Report - C27XA/CLLAE (Foreshore, adjacent to Blackfriars Bridge)Spring 2010PDF
    (79 pages)
    Site Suitability Report - C29XA (King Edward Memorial Park Foreshore) Note phase two to application also named: King Edward Memorial Park ForeshoreAutumn 2011PDF
    (89 pages)
    Site Suitability Report - C29XB (King Edward Memorial Park)Autumn 2011PDF
    (157 pages)
    Site Suitability Report - C31XA (Foreshore, adjacent to boat yard and St. George's Square)Spring 2010PDF
    (71 pages)
    Site Suitability Report - C31XB (Car park, St. George's Square)Spring 2010PDF
    (66 pages)
    Site Suitability Report - C31XC (Boat yard, Calypso Way)Spring 2010PDF
    (69 pages)
    Site Suitability Report - C31XK (Car park, corner of Grove Street and Plough Way)Spring 2010PDF
    (68 pages)
    Site Suitability Report - C31XY (Thames Water Earl Pumping Station, Yeoman Street)Spring 2010PDF
    (66 pages)
    Site Suitability Report - C31XY and C31XZ (Thames Water Earl Pumping Station plus industrial buildings, Yeoman Street) Note at phase one consultation named: Earl Pumping StationSpring 2010PDF
    (68 pages)
    Site Suitability Report - C31XZ (Industrial buildings, between Yeoman Street and Croft Street)Spring 2010PDF
    (65 pages)
    Site Suitability Report - C32XA (Foreshore, Borthwick Wharf, off Borthwick Street) Note at phase one consultation named: Borthwick Wharf ForeshoreSpring 2010PDF
    (74 pages)
    Site Suitability Report - C32XA Borthwick Wharf ForeshoreAutumn 2011PDF
    (86 pages)
    Site Suitability Report - C32XB (The AHOY Centre, junction Borthwick Street and Deptford Green)Spring 2010PDF
    (69 pages)
    Site Suitability Report - C32XC (Open space, Deptford Green)Spring 2010PDF
    (69 pages)
    Site Suitability Report - C32XL (Land adjacent to Bronze Street)Autumn 2011PDF
    (83 pages)
    Site Suitability Report - C32XZ (Deptford Church Street)Autumn 2011PDF
    (82 pages)
    Site Suitability Report - C33XA (Foreshore, near Greenwich Foot Tunnel)Spring 2010PDF
    (77 pages)
    Site Suitability Report - C33XV+CL004 or CL005 (Greenwich Pumping Station + Norman Road or Phoenix Wharf)Autumn 2011PDF
    (156 pages)
    Site Suitability Report - S01EG/C01YC (Acton Storm Tanks)Autumn 2011PDF
    (77 pages)
    Site Suitability Report - S01LM (Convoys Wharf) - Note - Main tunnel intermediate site to construct the Greenwich connection tunnelAutumn 2011PDF
    (80 pages)
    Site Suitability Report - S020T (Shadwell Basin)Autumn 2011PDF
    (90 pages)
    Site Suitability Report - S021T and C29XB (King Edward Memorial Park)Spring 2010PDF
    (97 pages)
    Site Suitability Report - S024T and S025T (Heckford Street)Autumn 2011PDF
    (81 pages)
    Site Suitability Report - S036T (Limehouse Basin)Autumn 2011PDF
    (82 pages)
    Site Suitability Report - S03EG (Acton Park Industrial Estate)Autumn 2011PDF
    (77 pages)
    Site Suitability Report - S04EG (Industrial units, Allied Way)Autumn 2011PDF
    (76 pages)
    Site Suitability Report - S17RD and C05XQ (Barn Elms)Autumn 2011PDF
    (116 pages)
    Site Suitability Report - S17RD and C05XQ (Barn Elms)Spring 2010PDF
    (87 pages)
    Site Suitability Report - S18WH (Feathers Wharf)Autumn 2011PDF
    (79 pages)
    Site Suitability Report - S33HF and C04XJ (Vacant land and Thames Water Hammersmith Pumping Station, Chancellors Road) Note at phase one consultation named: Hammersmith Pumping StationSpring 2010PDF
    (75 pages)
    Site Suitability Report - S54SK (King's Stairs Gardens)Autumn 2011PDF
    (142 pages)
    Site Suitability Report - S54SK (King's Stairs Gardens, Jamaica Road)Spring 2010PDF
    ( pages)
    Site Suitability Report - S61WH (Battersea Park)Spring 2010PDF
    (88 pages)
    Site Suitability Report - S68WH and S69WH (Battersea Power Station)Spring 2010PDF
    (107 pages)
    Site Suitability Report - S69HF (Hurlingham Wharf and Whiffin Wharf, Carnwath Road)Spring 2010PDF
    (60 pages)
    Site Suitability Report - S70HF (Carnwath Road industrial estate, Carnwath Road)Spring 2010PDF
    (60 pages)
    Site Suitability Report - S72HF (Fulham Depot, next to Wandsworth Bridge, Townmead Road)Spring 2010PDF
    (69 pages)
    Site Suitability Report - S72WH/S93WH (Kirtling Street (with Cringle Wharf)) Note at phase two consultation to application known as: Kirtling StreetAutumn 2011PDF
    (112 pages)
    Site Suitability Report - S74SK (Boat yard, Calypso Way)Autumn 2011PDF
    (78 pages)
    Site Suitability Report - S76HF (Former part of Imperial Wharf, Imperial Crescent)Spring 2010PDF
    (61 pages)
    Site Suitability Report - S76SK (Chambers Wharf)Autumn 2011PDF
    (120 pages)
    Site Suitability Report - S79WH, S80WH and C17XB (Tideway industrial area, Nine Elms Lane) Note at phase one consultation named: Tideway WalkSpring 2010PDF
    (78 pages)
    Site Suitability Report - S82NM (Thames Water Beckton Sewage Treatment Works)Spring 2010PDF
    (70 pages)
    Site Suitability Report - S84NM (Abbey Mills Pumping Station)Spring 2012PDF
    (105 pages)
    Site Suitability Report - S85NM (Three Mills Green)Spring 2010PDF
    (81 pages)
    Site Suitability Report - S86NM (Three Mills Studios)Spring 2010PDF
    (87 pages)
    Site Suitability Report - S86WH with S80WH (Post office, Nine Elms Lane)Autumn 2011PDF
    (102 pages)
    Site Suitability Report - S87HF (Carnwath Road Riverside)Autumn 2011PDF
    (94 pages)
    Site Suitability Report - S92WH (Part of Battersea Power Station)Autumn 2012PDF
    (105 pages)
    Site Suitability Report - S93WH (Kirtling Street)Autumn 2011PDF
    (102 pages)
    Site Suitability Report - S94WH with S80WH (Post Office Way)Autumn 2011PDF
    (100 pages)
    Site Suitability Report - S95WH (Depots, Ponton Road)Autumn 2011PDF
    (105 pages)
    Summary of Further On-site Mitigation Measures and Revisions to Compensation Policies

    Submitted to the Planning Inspectorate on 13 January 2014

    PDF
    (117 pages)
    The Draft Thames Water Utilities Limited (Thames Tideway Tunnel) Development Consent Order - Comparite against 23 September 2013Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (321 pages)
    The Draft Thames Water Utilities Limited (Thames Tideway Tunnel) Development Consent Order - Comparite against 28 February 2013Draft submitted to the Planning Inspectorate on 13 January 2014PDF
    (326 pages)
    The Draft Thames Water Utilities Limited (Thames Tideway Tunnel) Development Consent Order - Revised 13 JanuaryDraft submitted to the Planning Inspectorate on 13 January 2014PDF
    (301 pages)
    Written Representation: Chambers Wharf – Proposed changes to working hoursThis written representation has been submitted to the Planning Inspectorate. Its purpose is to make public our current thinking on working hours at the proposed Chambers Wharf site, and to allow stakeholders and interested parties to submit representations to the Planning Inspectorate before we take our final decision.PDF
    (5 pages)
  • Home
  • What we’re doing
  • News
  • Document library
  • Construction sites
  • Procurement
  • Sitemap
  • Home

    • What we're doing

      • Our plan
      • The need to clean up the Thames
      • Our proposed solution
      • How we will build the tunnel
      • Timetable
    • News

      • Pupils create new ideas for a future London
      • Thames Tideway Tunnel announces two new apprenticeships
      • Thames21 launches a new citizen science project for the tidal Thames
      • Final destination for London’s deepest tunnel
      • ‘Supersewer’ recruits Crossrail’s Andrew Mitchell as CEO
      • Document library

        • Timeline of documents
        • Documents by category
          • Archive: EIA scoping report and appendices
          • Archive: Interim engagement documents
          • Archive: Phase 1 consultation documents
          • Archive: Pre-consultation documents
      • Construction sites

        • Procurement

          Thames Tideway Tunnel: Creating a cleaner, healthier River Thames.

          Registered office: Thames Water Utilities Limited, Clearwater Court, Vastern Road, Reading, Berkshire RG1 8DB
          Company number: 2366661 Registered in England and Wales

          • Contact us
          • Cookies and privacy
          • Disclaimer
          • Language
          • Extra care
          • Jobs

          View site in high contrast

          www.thameswater.co.uk