Phase 1 consultation documents (September 2010 – January 2011).

Abbey Mills Pumping Station – phase one site information paper – Open document
Site specific information paper about the shortlisted sites and preferred option for a worksite in the Abbey Mills area to be used to construct the main tunnel of the project. Paper describes use of preferred site during construction and permanent use after construction is finished.

Acton Storm Tanks – phase one site information paper – Open document
Site specific information paper about the shortlisted sites and preferred option for a worksite to connect to the CSO known as Acton Storm Relief. Paper describes use of preferred site during construction and permanent use after construction is finished.

Albert Embankment Foreshore – phase one site information paper – Open document
Site specific information paper about the shortlisted sites and preferred option for a worksite to connect to two local CSOs known as Clapham Storm Relief and Brixton Storm Relief. Paper describes use of preferred site during construction and permanent use after construction is finished.

Amalgamated Report – Appendices (combined pdf file) – Open document
The appendices included the main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Amalgamated Report – Main Report (combined pdf file) – Open document
The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Amendments to the Report on phase one consultation – Open document
Document setting out the amendments to the Report on phase one consultation following its publication.

Barn Elms – phase one site information paper – Open document
Site specific information paper about the shortlisted sites and preferred option for a worksite in the Barn Elms area to be used to construct the main tunnel of the project and also to connect to the CSO known as West Putney Storm Relief Sewer.

Beckton Sewage Treatment Works – phase one site information paper – Open document
Site specific information paper about types of works proposed at Beckton Sewage Treatment Works such as the installation of additional pumps and extension of odour control facilities.

Bell Lane Creek – phase one site information paper – Open document
Site specific information paper about the shortlisted site and preferred option for a worksite to connect to the CSO known as Frogmore Storm Relief. Paper describes use of preferred site during construction and permanent use after construction is finished.

Blackfriars Bridge Foreshore – phase one site information paper – Open document
Site specific information paper about the preferred option for a worksite to connect Fleet Main CSO and the northern Low Level Number 1 Sewer to the main tunnel. Paper describes use of preferred site during construction and permanent use after construction is finished.

Borthwick Wharf Foreshore – phase one site information paper – Open document
Site specific information paper about the shortlisted sites and preferred option for a worksite to connect to the CSO known as Deptford Storm Relief. Paper describes use of preferred site during construction and permanent use after construction is finished.

Bridges Court Car Park – phase one site information paper – Open document
Site specific information paper about the shortlisted sites and preferred option for a worksite to connect to the CSO known as Falconbrook Pumping Station. Paper describes use of preferred site during construction and permanent use after construction is finished.

Build – How we will build the tunnel – Open document
Project information paper explaining the stages of how the Thames Tunnel will be built, looking at the key points required in construction as well as the balancing act of how Thames Water have arrived at the solution of the particular type of tunnel proposed.

Butcher Row – phase one site information paper – Open document
Site specific information paper about the shortlisted sites and preferred option for a worksite to connect to the CSO known as Holloway Storm Relief. Paper describes use of preferred site during construction and permanent use after construction is finished.

Chapter 01 – Introduction – Open document
The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.

Chapter 02-04 – Need, Solution and Route – Open document
The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.

Chapter 29 – Consultation Process – Open document
The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.

Chelsea Embankment Foreshore – phase one site information paper – Open document
Site specific information paper about the preferred option for a worksite to connect Ranelagh CSO and the northern Low Level Number 1 Sewer to the main tunnel. Paper describes use of preferred site during construction and permanent use after construction is finished.

Community consultation strategy – Open document
Thames Water proposes to design and build and operate a tunnel to capture untreated sewage, which currently flows directly into the River Thames after as little as 2mm of rainfall.  This community consultation strategy, summarised in the formal Statement of Community Consultation, sets out our approach and timetable for consulting all those with an interest in the proposed Thames Tunnel.

Construction sites – The site selection process – Open document
Project information paper explaining the rigorous process for choosing the most suitable worksites for the project to go ahead.

Cover, contents and list of abbreviations – Open document
The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Cover, contents and list of abbreviations – Open document
The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.

Cremorne Wharf Foreshore – phase one site information paper – Open document
Site specific information paper about the preferred option for a worksite to connect to the CSO known as Lots Road Pumping Station. Paper describes use of preferred site during construction and permanent use after construction is finished.

Customer overview leaflet – Open document
Booklet aimed at Thames Water customers about the need for the tunnel, the initial proposals and the big picture.

Depth – Open document
Tunnelling under London Project information paper explaining the depth of the main tunnel and some key considerations and constraints to be taken into account when deciding the route, such as location of CSOs and avoidance of existing underground infrastructure such as road tunnels and mains electricity cables.

Druid Street – phase one site information paper – Open document
Site specific information paper about the shortlisted sites and preferred option for a worksite to connect to the CSO known as Shad Thames Pumping Station. Paper describes use of preferred site during construction and permanent use after construction is finished.

Earl Pumping Station – phase one site information paper – Open document
Site specific information paper about the shortlisted sites and preferred option for a worksite to connect to the CSO known as Earl Pumping Station. Paper describes use of preferred site during construction and permanent use after construction is finished.

Environment – Caring for the Environment – Open document
Project information paper explaining the various topics which will be included in the appraisal of environmental issues affecting the tunnel, such as: air quality, archaeology, flood risk and noise.

Foreword – Open document
The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Funding – Open document
How we will fund construction Project information paper explaining how the project will be funded including information of the likely financial impacts on Thames Water customers over the period of the project and into the future.

Glossary – Open document
Glossary of terms.

Glossary – Open document
Glossary of terms.

Greenwich Pumping Station – phase one site information paper – Open document
Site specific information paper about the shortlisted site and preferred option for a worksite to connect to the CSO known as Greenwich Pumping Station. Paper describes use of preferred site during construction and permanent use after construction is finished.

Greenwich Pumping Station – Information Paper – Open document
Information Paper looking at the option for a new tunnelling strategy and an alternative proposal to tunnel from King’s Stairs Gardens to Greenwich Pumping Station, to provide a connection tunnel from Greenwich Pumping Station to proposed site at Chambers Wharf.

Hammersmith Pumping Station – phase one site information paper – Open document
Site specific information paper about the shortlisted sites and preferred option for a worksite in the Hammersmith area to be used to construct the main tunnel of the project and also to connect to the CSO known as Hammersmith Pumping Station.

Heckford Street Industrial Area – Information Paper – Open document
Information paper discussing work to connect to the North East Storm Relief CSO and, as a response to community feedback, looking at the option of combining a site in Heckford Street Industrial Area with a worksite at King Edward Memorial Park.

Jews Row – phase one site information paper – Open document
Site specific information paper about the shortlisted sites and preferred option for a worksite to connect two local CSOs known as Falconbrook Storm Relief and Wandle Valley Storm Relief. Paper describes use of preferred site during construction and permanent use after construction is finished.

King Edward Memorial Park Foreshore – phase one site information paper – Open document
Site specific information paper about the shortlisted site and preferred option for a worksite to connect to the CSO known as North East Storm Relief. Paper describes use of preferred site during construction and permanent use after construction is finished.

King George’s Park – phase one site information paper – Open document
Site specific information paper about the shortlisted site and preferred option for a worksite to connect to the CSO known as Frogmore Storm Relief. Paper describes use of preferred site during construction and permanent use after construction is finished.

King’s Stairs Gardens – phase one site information paper – Open document
Site specific information paper about the preferred option for a worksite in the Bermondsey area to be used to construct the main tunnel of the project and also to connect four local CSOs from the surrounding area to the tunnel.

Land – How will we fund construction – Open document
Project information paper explaining how Thames Water will aim to ensure that worksites are, as far as possible, returned to their previous states, or improved once work is completed.

Main Report on Phase 1 Consultation – Appendix A, Route Map – Open document
Main Report on Phase 1 Consultation – Appendix A, Route Map

Main Report on Phase 1 Consultation – Appendix B, Statement of Community – Open document
Consultation Statement of Community Consultation

Main Report on Phase 1 Consultation – Appendix C, Statutory Consultees – Open document
Statutory Consultees

Main Report on Phase 1 Consultation – Appendix D, Newspaper Adverts – Open document
Newspaper Adverts

Main Report on Phase 1 Consultation – Appendix E, Letter Types – Open document
Letter Types

Main Report on Phase 1 Consultation – Appendix F, Community Audit Methodology and Data – Open document
Community Audit Methodology and Data

Main Report on Phase 1 Consultation – Appendix G, Public Meetings with Stakeholders – Open document
Public Meetings with Stakeholders

Main Report on Phase 1 Consultation – Appendix H, Town Halls and Libraries – Open document
Town Halls and Libraries

Main Report on Phase 1 Consultation – Appendix I, Exhibitions and Visitor Numbers – Open document
Exhibitions and Visitor Numbers

Main Report on Phase 1 Consultation – Appendix J, Feedback Form – Open document
Feedback Form

Main Report on Phase 1 Consultation – Appendix K, Feedback Quantification – Open document
Feedback Quantification

Managing Construction – Open document
Project information paper explaining the measures already undertaken and that will be implemented during construction to minimise disruption to communities across London.

Map – London – Open document
London wide map showing the route of the preferred tunnel and other considered routes as well as locations of preferred and other worksites.

Map – Central London – Open document
Map of Central London showing preferred and other considered routes, local CSOs, pumping stations and worksites.

Map – East London – Open document
Map of East London showing preferred and other considered routes, local CSOs, pumping stations and worksites

Map – West London – Open document
Map of West London showing preferred route, local CSOs, pumping stations and worksites.

Odour – Open document
Project information paper explaining the mitigation measures Thames Water are proposing to ensure that the tunnel is adequately ventilated and that odour cannot become a nuisance.

Options – Alternatives to the Thames Tunnel – Open document
Project information paper looking at the various alternative options to the Thames Tunnel , including sustainable urban drainage systems, separation of the sewerage system, bubbler and skimmers boats and storage and transfer.

Other Shortlisted Sites – phase one site information paper – Open document
Site specific information paper identifying different sites that were shortlisted for the Rotherhide and River Thames tunnel routes but were not required for the preferred Abbey Mills Route.

Other Works – phase one site information paper – Open document
Site specific information paper explaining other works to be undertaken in association with the Thames Tunnel project which include connections to northern Low Level Number 1 Sewer, minor sewer modifications and safety access points, as well as differences to works to intercept Charlton CSO.

Overflow – Why we need to clean up the Thames – Open document
Project information paper providing information on how the existing sewage system is inadequate for modern needs and subsequently why the Thames Tunnel is required and how it will help combat overflows of sewage into the Thames.

Project Overview – Open document
Overview of the complete Thames Tunnel project for phase one consultation.

Putney Bridge Foreshore – phase one site information paper – Open document
Site specific information paper about the shortlisted sites and preferred option for a worksite to connect to the CSO known as Putney Bridge. Paper describes use of preferred site during construction and permanent use after construction is finished.

Regulatory framework – Open document
Project information paper setting out the regulatory framework Thames Water is required to work within as set out by key organisations such as the European Union, Ofwat, the Environment Agency and Local Authorities.

Report on phase one consultation – Abbey Mills Pumping Station – Open document
The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Report on phase one consultation – Acton Storm Tanks – Open document
The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Report on phase one consultation – Albert Embankment Foreshore – Open document
The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Report on phase one consultation – Barn Elms – Open document
The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Report on phase one consultation – Beckton Sewage Treatment Works – Open document
The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Report on phase one consultation – Bell Lane Creek – Open document
The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Report on phase one consultation – Blackfriars Bridge Foreshore – Open document
The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Report on phase one consultation – Borthwick Wharf Foreshore – Open document
The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Report on phase one consultation – Bridges Court Car Park – Open document
The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Report on phase one consultation – Butcher Row – Open document
The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Report on phase one consultation – Chelsea Embankment Foreshore – Open document
The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Report on phase one consultation – Cremorne Wharf Foreshore – Open document
The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Report on phase one consultation – Druid Street – Open document
The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Report on phase one consultation – Earl Pumping Station – Open document
The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Report on phase one consultation – Greenwich Pumping Station – Open document
The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Report on phase one consultation – Hammersmith Pumping Station – Open document
The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Report on phase one consultation – Jews Row – Open document
The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Report on phase one consultation – King Edward Memorial Park Foreshore – Open document
The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Report on phase one consultation – Kings George’s Park – Open document
The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Report on phase one consultation – King’s Stairs Gardens – Open document
The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Report on phase one consultation – Putney Bridge – Open document
The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Report on phase one consultation – Tideway Walk – Open document
The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Report on phase one consultation – Victoria Embankment Foreshore – Open document
The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Routes – Development of the tunnel route – Open document
Project information paper showing the development of the different route options for the Thames Tunnel and outlining the preferred route and reasons for this choice.

Section 1 – Approach to consultation – Open document
The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Section 2 – Need, solution and tunnel route – Open document
The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Section 4 – Approach to consultation – Open document
The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Section 5 – Conclusion – Open document
The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Statement of Community Consultation – Open document
Our statement on who we will consult, how we will consult and what we will consult stakeholders on regarding the Thames Tunnel.

Summary Report on Phase 1 Consultation – Open document
A summary of the main report of phase one consultation for the Thames Tunnel. The document provides a summary of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.

Supplementary Report (combined pdf file) – Open document
The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.

Supplementary report on phase one consultation – Abbey Mills Pumping Station – Open document
The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.

Supplementary report on phase one consultation – Acton Storm Tanks – Open document
The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.

Supplementary report on phase one consultation – Albert Embankment Foreshore – Open document
The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.

Supplementary report on phase one consultation – Barn Elms – Open document
The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.

Supplementary report on phase one consultation – Beckton Sewage Treatment Works – Open document
The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.

Supplementary report on phase one consultation – Bell Lane Creek – Open document
The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.

Supplementary report on phase one consultation – Blackfriars Bridge Foreshore – Open document
The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.

Supplementary report on phase one consultation – Borthwick Wharf Foreshore – Open document
The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.

Supplementary report on phase one consultation – Bridge’s Court Car Park – Open document
The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.

Supplementary report on phase one consultation – Butcher Row – Open document
The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.

Supplementary report on phase one consultation – Chelsea Embankment – Open document
The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.

Supplementary report on phase one consultation – Cremorne Wharf Foreshore – Open document
The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.

Supplementary report on phase one consultation – Druid Street – Open document
The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.

Supplementary report on phase one consultation – Earl Pumping Station – Open document
The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.

Supplementary report on phase one consultation – Greenwich Pumping Station – Open document
The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.

Supplementary report on phase one consultation – Hammersmith Pumping Station – Open document
The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.

Supplementary report on phase one consultation – Jews Row – Open document
The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.

Supplementary report on phase one consultation – King Edward Memorial Park – Open document
The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.

Supplementary report on phase one consultation – King George’s Park – Open document
The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.

Supplementary report on phase one consultation – King’s Stairs Gardens
The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.

Supplementary report on phase one consultation – Other shortlisted Sites and Other Works – Open document
The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.

Supplementary report on phase one consultation – Putney Bridge Foreshore – Open document
The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.

Supplementary report on phase one consultation – Tideway Walk – Open document
The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.

Supplementary report on phase one consultation – Victoria Embankment Foreshore – Open document
The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.

Tideway Walk – phase one site information paper – Open document
Site specific information paper about the shortlisted sites and preferred option for a worksite in the Battersea area to be used to construct the main tunnel of the project and also to connect two CSOs known as Heathwall Pumping Station and South West Storm Relief.

Timing – Likely timescale – Open document
Project information paper identifying the key dates associated with the project up to its completion in 2020.

Transport – Using the river to transport materials – Open document
Project information paper explaining the preferred choice of river transport to move materials for the construction of the Thames Tunnel therefore, as far as possible, practicable and cost effective, reducing impact on local roads and highways.

Victoria Embankment Foreshore – phase one site information paper – Open document
Site specific information paper about the shortlisted site and preferred option for a worksite to connect Regent Street CSO and the northern Low Level Number 1 Sewer to the main tunnel. Paper describes use of preferred site during construction and permanent use after construction is finished.

Views – Tell us what you think – Open document
Project information paper providing information on consultation objectives as well as varying ways of contacting and leaving feedback for the project team.

Why does London need the Thames Tideway Tunnel? – Open document
A background to the reasons behind the requirement for the Thames Tideway Tunnel including a brief history, reasons why it is time to act now, the challenges the project faces, examples of similar projects in other major cities around the world and the alternative options considered.

Comments are closed.