The Site Suitability Reports and Engineering Options Reports are historic reports that informed the site selection process for the proposed Thames Tideway Tunnel. These reports are summarised in report 7.05 Final Report on Site Selection process, submitted to the Planning Inspectorate with our application for development consent in February 2013.

Download the document